924 South Heald Street      Wilmington, DE 19801      Phone: (302) 658-6524      Fax: (302) 658-0684

Projects:

Delaware Army National Guard Army Aviation Support Facility
A $28,000,000 Hangar Facility at the Delaware Army National Guard
More >>

SR-1 Pave & Rehab Overlay
Winner of several construction excellence awards this projec has become the poster child for ASR deteriorated concrete roadways.
More >>

I-95 5th Lane Project
More >>

Christiana Mall Re-Development Project
Christiana Mall forged ahead with a 60 million dollar expansion during one of the worst economic down turns in history. Diamond Materials performed the nearly 10 million dollar site work package contributing to the projects great success.
More >>

Commercial Snow Removal
More >>

Newark Library Site Project
More >>

Bridge 358 Project on US Route 40
A $1.7 million construction project to add double left turning lanes and pedestrian crossings to the intersection of Kirkwood Highway Del RT 2 and RT 7.

The changes will alleviate traffic problems by allowing twice as many cars to turn during one light cycle. Pedestrian crosswalks, signals and lighting are being added because of the amount of foot traffic drawn by businesses in the area.
More >>

Kirkwood Highway
The $5.8 million SR2/SR7 Kirkwood Highway Improvement Project.

The Improvement Project, which began in April 2001, involved a two-mile section of Kirkwood Highway, from the route 141 ramp to route 100. Project features included traffic signal improvements, extensive landscaping in the medians and along sidewalks, the addition of turning lanes, curbing, benches and sidewalks, and the removal of some crossovers. The road surface was completely removed and resurfaced with hot mix asphalt pavement.
More >>







- An Equal Opportunity Employer -

Admin Login