Diamond Materials is currently working on a one million square foot warehouse on 22 acres in Logan Township for Burlington Coat Factory. Below is the work being performed –
Topsoil stripped: 66,000 CY Cuts to fills: 147,374 CY Storm sewer: 11,000 LF Sanitary sewer: 1080 LF Waterline: 10,000 LF Sidewalk: 15,810 SF Belgium Block Curb: 21,635 LF Paving: 43,000 TONS
8” Thick Loading dock and Dolly Pads =250,000 SF
Excavate and install three Basins