DCIM100MEDIADJI_0001.JPG
DCIM100MEDIADJI_0002.JPG
DCIM100MEDIADJI_0005.JPG
DCIM100MEDIADJI_0010.JPG
Tinton falls2
Tinton Falls
tf61
tf60
tf59
tf58
tf57
tf56
tf55
tf53
tf43
tf44
tf46
tf45
tf47
tf48
tf49
tf50
tf51
tf52
tf42
tf41
tf40
tf39
tf38
tf37
tf35
tf36
tf34
tf33
tf23
tf24
tf25
tf26
tf27
tf28
tf29
tf30
tf31
tf32
tf22
tf21
tf20
tf19
tf18
tf17
tf16
tf15
tf14
tf13
tf12
tf11
tf10
TF9
tf8
tf7
tf6
tf5
tf4
TF3
previous arrow
next arrow
Project Details:

Project is a 113, 000 SF ware house building with car, van, truck parking and loading dock. A portion of the sitework was done by Caruso excavating which included mainly work below subgrade. Diamond was contract to do portions of the site work from subgrade elevation to the surface.  Project value is approximately 4M.

 

  • Our scope of work included the following:

    • Installation of stone subbase for the 116K SF building pad
    • Installation of over 14,000 LF of concrete curb
    • Installation of over 27K SF of concrete sidewalk
    • Installation of  over 30K tons of DGA Subbase
    • Installation of over 20K tons of HMA Pavement
    • Striping
    • Installations of ADA sign Bollards and DOT signs
    • Concrete wheel stops
    • Installation of 2300 SF Retaining Wall
    • Installation of Ride share and Bus shelter.
    • Performed miscellaneous site activities as needed for the GC (RC Andersen).
    • Included an accelerated construction schedule to meet the GC’s timeline.
Project Details:

Project:

Prologis Tinton Falls

 

Location: 

Tinton Falls

 

Duration: 

2021-2022

 

Client:

RC Anderson

 

Sq Ft:

113,000