Diamond Materials recently completed a significant project at Route 38 and Lawrence Blvd, New Jersey, transforming 35 acres of land into a new 478,715 square foot warehouse with 127 trailer stalls and a distribution facility. The extensive work involved stripping 26,340 cubic yards of topsoil, making cuts and fills of 70,300 cubic yards, and installing 2,605 linear feet of storm sewer, 9,050 linear feet of sanitary sewer, and 6,713 linear feet of waterline. Additionally, 7,000 square feet of sidewalk, 23,500 linear feet of curb, and 15,205 tons of paving were completed. The project also featured a 9-inch thick loading dock and dolly pads covering 120,795 square feet, excavation and installation of three bio-retention ponds, a 2,580 square foot retaining wall, 26 catch basins, and a wet tap.