Diamond Materials completed a substantial construction project on a 22-acre site in Logan Township for Burlington Coat Factory, developing a one million square foot warehouse. This extensive work included stripping 66,000 cubic yards of topsoil and transferring 147,374 cubic yards of earth for cuts and fills. The project also involved significant infrastructure work: laying 11,000 linear feet of storm sewer, 1,080 linear feet of sanitary sewer, and 10,000 linear feet of waterline. Additionally, 15,810 square feet of sidewalk, 21,635 linear feet of Belgium block curb, and 43,000 tons of paving were constructed. The development features a robust 8-inch thick loading dock and dolly pads covering 250,000 square feet, along with the excavation and installation of three basins.