Project Details:

Project: Prologis Tinton Falls

Location: Tinton Falls

Duration: 2021-2022

Client: RC Anderson

Sq Ft: 113,000

Project Details:

This project, valued at approximately $4 million, involves completing the site work for a 113,000 square foot warehouse with facilities for car, van, and truck parking, along with a loading dock. Caruso Excavating initially handled a portion of the site work, focusing mainly on subgrade activities. Diamond was contracted for site work from subgrade elevation to the surface. Our scope of work included installing a stone subbase for the building pad, over 14,000 linear feet of concrete curb, more than 27,000 square feet of concrete sidewalk, over 30,000 tons of DGA Subbase, and over 20,000 tons of HMA Pavement. Additional tasks encompassed striping, installing ADA sign bollards, DOT signs, concrete wheel stops, a 2,300 square foot retaining wall, a ride share, and a bus shelter. Miscellaneous site activities were also performed for the general contractor, RC Andersen, with an accelerated construction schedule to meet their timeline.